Brain
/
RFI & Submittal Board
Tue · Jun 9
Brief me
Compose
RFI · SUBMITTAL BOARD
|
108
items
·
0
open
·
33
overdue
|
4 proj
Kanban
Table
Summarize overdue
New RFI
filter
ALL
Gainesville Elevators
EHRM Miami
Bay Pines SPS
Misc / Other Projects
ALL
RFI
SUB
Assignee
Due date
OPEN
0
empty
RESPONDED
21
RFI
9
2025-06-09T00:00:00+00:00
Power for VRF Condensing unit
EHRM Miami
·
['Electrical', 'Mechanical']
3
Betsayda Morazan
RFI
14
2025-07-17T00:00:00+00:00
Wall Termination at Room C814 (Adjacent to C811B)
EHRM Miami
·
['Architectural']
2
Betsayda Morazan
RFI
22
2025-07-18T00:00:00+00:00
Clarification on Relocation of CHS Pipes Identified on Drawing MP422
EHRM Miami
·
['Plumbing']
2
Betsayda Morazan
RFI
24
2025-07-30T00:00:00+00:00
Request to Leave Existing Hot Water Pipe in Place-B1107
EHRM Miami
·
['Mechanical']
Betsayda Morazan
RFI
27.1
2025-08-27T00:00:00+00:00
Suspected and Confirmed Asbestos – 8th and 9th Floor Rooms Not Included in Original Survey
EHRM Miami
·
['Other']
2
Betsayda Morazan
RFI
44
2025-10-20T00:00:00+00:00
Clarification on Cable Basket/J-Hooks Layout and Smoke Compartment Sleeves
EHRM Miami
·
['Electrical']
Betsayda Morazan
RFI
48
2025-10-29T00:00:00+00:00
DDC System Design Review
EHRM Miami
·
['Design Systems Integrator']
Betsayda Morazan
RFI
49
2025-11-04T00:00:00+00:00
Basket/J-Hook Installation and Sleeve Requirements
EHRM Miami
·
['Pathways']
Betsayda Morazan
RFI
52
2025-12-12T00:00:00+00:00
Verification of VAV Removal in Room C914
EHRM Miami
·
—
Betsayda Morazan
RFI
55
2025-12-16T00:00:00+00:00
Clarification on Demolition Scope TR-B706B – MP422 Surrounding Ductwork
EHRM Miami
·
['Mechanical']
Betsayda Morazan
RFI
35
2025-12-16T00:00:00+00:00
Clarification on Security System IP Addresses, Video Server, and Camera Placement
EHRM Miami
·
['Security']
1
Betsayda Morazan
RFI
54
2025-12-19T00:00:00+00:00
Exhaust Ductwork in Rooms B920A and C914
EHRM Miami
·
—
Betsayda Morazan
RFI
56
2025-12-24T00:00:00+00:00
Unclear Pathway for Mechanical Reroute TR B614A
EHRM Miami
·
['Mechanical']
Betsayda Morazan
RFI
57
2026-01-10T00:00:00+00:00
Room 5618 – Rerouting of Ductwork and Cable Rack Conflict
EHRM Miami
·
['Mechanical']
Betsayda Morazan
RFI
59
2026-01-23T00:00:00+00:00
Fire/Smoke Sleeves & Corridor Cable Tray Routing
EHRM Miami
·
—
Betsayda Morazan
RFI
67
2026-02-23T00:00:00+00:00
Clarification of Existing Plumbing Components – Room B614A
EHRM Miami
·
['Plumbing']
Betsayda Morazan
RFI
70
2026-05-04T00:00:00+00:00
120V Feeder Circuit Required for Dedicated DDC Step-Down Panels
EHRM Miami
·
['Design Systems Integrator', 'Electrical']
Betsayda Morazan
RFI
71
2026-05-06T00:00:00+00:00
Additional 10 BACnet Gateways Required for Mechanical VRF-to-DDC/BAS Communication
EHRM Miami
·
—
Betsayda Morazan
RFI
74
2026-05-18T00:00:00+00:00
TR-C409D – Wall Height / Extent to Deck
EHRM Miami
·
['Architectural']
Betsayda Morazan
RFI
73
2026-05-18T00:00:00+00:00
TR-B427 – West Wall Height / Extent to Deck
EHRM Miami
·
['Architectural']
Betsayda Morazan
RFI
72
2026-05-18T00:00:00+00:00
TR-B427- Water supply and Sanitary drain lines
EHRM Miami
·
['Plumbing']
Betsayda Morazan
OVERDUE
33
RFI
055
2026-05-12T09:00:00+00:00
Fire-rated lobby door hardware
Gainesville Elevators
·
—
RFI
061
2026-05-14T04:21:05+00:00
Phase 1 to Phase 2 transition logistics
Gainesville Elevators
·
—
RFI
046
2026-05-14T17:00:00+00:00
Welded Rail Connection Code Compliance
Gainesville Elevators
·
—
RFI
025
2026-05-14T23:33:05+00:00
OI&T pathway routing — patch panel location
Bay Pines SPS
·
—
RFI
061
2026-05-15T01:29:48+00:00
Phase 1 to Phase 2 transition logistics
Gainesville Elevators
·
—
RFI
025
2026-05-15T20:41:48+00:00
OI&T pathway routing — patch panel location
Bay Pines SPS
·
—
RFI
019
2026-05-16T09:00:00+00:00
VAV terminal sizing for Wing C
Bay Pines SPS
·
—
RFI
047
2026-05-16T17:00:00+00:00
P9/P10 Rail Cut Verification
Gainesville Elevators
·
—
RFI
059
2026-05-17T04:21:05+00:00
Emergency power circuit for elevator
Gainesville Elevators
·
—
RFI
75
2026-05-18T00:00:00+00:00
TR-C409D – Unidentified 1-1/2” DWV Line
EHRM Miami
·
['Plumbing']
CA Dept
RFI
059
2026-05-18T01:29:48+00:00
Emergency power circuit for elevator
Gainesville Elevators
·
—
RFI
053
2026-05-18T09:00:00+00:00
Counterweight guide rail spec conflict
Gainesville Elevators
·
—
RFI
054
2026-05-18T09:00:00+00:00
Hoistway ventilation fan sizing
Gainesville Elevators
·
—
RFI
052
2026-05-18T17:00:00+00:00
Elevator pit waterproofing detail
Gainesville Elevators
·
—
RFI
008
2026-05-18T17:00:00+00:00
Abatement Scope Clarification - Building 7
Bay Pines SPS
·
—
RFI
058
2026-05-19T04:21:05+00:00
Hoistway venting requirement at penthouse
Gainesville Elevators
·
—
RFI
022
2026-05-19T04:21:05+00:00
Pharmacy fume hood exhaust routing
Bay Pines SPS
·
—
RFI
022
2026-05-20T01:29:48+00:00
Pharmacy fume hood exhaust routing
Bay Pines SPS
·
—
RFI
058
2026-05-20T01:29:48+00:00
Hoistway venting requirement at penthouse
Gainesville Elevators
·
—
RFI
023
2026-05-21T04:21:05+00:00
Cabinet weight capacity for Parata system
Bay Pines SPS
·
—
RFI
023
2026-05-22T01:29:48+00:00
Cabinet weight capacity for Parata system
Bay Pines SPS
·
—
RFI
060
2026-05-22T04:21:05+00:00
Cab interior fire rating verification
Gainesville Elevators
·
—
RFI
060
2026-05-23T01:29:48+00:00
Cab interior fire rating verification
Gainesville Elevators
·
—
RFI
062
2026-05-25T04:21:05+00:00
Concrete strength for elevator pit slab
Gainesville Elevators
·
—
RFI
062
2026-05-26T01:29:48+00:00
Concrete strength for elevator pit slab
Gainesville Elevators
·
—
RFI
76
2026-05-27T00:00:00+00:00
North Shaft Wall Condition – Room B427
EHRM Miami
·
['Architectural']
CA Dept
RFI
024
2026-05-27T04:21:05+00:00
Anti-microbial flooring transition at door
Bay Pines SPS
·
—
RFI
79
2026-05-28T00:00:00+00:00
TR-A308 Existing Ductwork and Dampers
EHRM Miami
·
['Mechanical']
CA Dept
RFI
78
2026-05-28T00:00:00+00:00
Wall Height / Above Ceiling Conditions – TR 2A150C4
EHRM Miami
·
['Architectural']
CA Dept
RFI
77
2026-05-28T00:00:00+00:00
Wall Height / Above Ceiling Conditions – Room 2B126
EHRM Miami
·
—
Jose Gonzalez
RFI
024
2026-05-28T01:29:48+00:00
Anti-microbial flooring transition at door
Bay Pines SPS
·
—
RFI
81
2026-06-03T00:00:00+00:00
TR-C301G – New Wall Installation Conflict with Existing Ductwork Above Ceiling
EHRM Miami
·
['Architectural']
Jose Gonzalez
RFI
80
2026-06-03T00:00:00+00:00
TR-B427 – Drain Line Routing Conflict and Ceiling Clearance Issue
EHRM Miami
·
['Plumbing']
CA Dept
CLOSED
54
RFI
2
2025-05-15T00:00:00+00:00
Pneumatic Tube System
EHRM Miami
·
['Architectural']
1
Betsayda Morazan
RFI
6
2025-05-16T00:00:00+00:00
Updates between drawing's dates
EHRM Miami
·
—
1
Betsayda Morazan
RFI
3
2025-05-16T00:00:00+00:00
Channel Rack Size
EHRM Miami
·
—
1
Betsayda Morazan
RFI
1
2025-05-19T00:00:00+00:00
Commissioning Agent
EHRM Miami
·
—
4
Betsayda Morazan
RFI
5
2025-05-29T00:00:00+00:00
Mold TR-C1201B
EHRM Miami
·
['Architectural']
2
Betsayda Morazan
RFI
4
2025-05-29T00:00:00+00:00
Opening in fire rated wall
EHRM Miami
·
['Fire Protection']
2
Betsayda Morazan
RFI
7
2025-06-02T00:00:00+00:00
TR C1201B Wall thermostat
EHRM Miami
·
['Mechanical']
2
Betsayda Morazan
RFI
10
2025-06-06T00:00:00+00:00
Plumbing Removal in TR-B920A
EHRM Miami
·
['Plumbing', 'Electrical']
1
Betsayda Morazan
RFI
8
2025-06-06T00:00:00+00:00
Piping for TR C914
EHRM Miami
·
['Plumbing']
2
Betsayda Morazan
RFI
12
2025-07-03T00:00:00+00:00
Conflict Between In-Swing Doors and Specified Electrified Panic Devices
EHRM Miami
·
['Architectural']
2
Betsayda Morazan
RFI
13
2025-07-07T00:00:00+00:00
Electrical Connection Clarification for Split Units
EHRM Miami
·
['Electrical']
2
Betsayda Morazan
RFI
15
2025-07-17T00:00:00+00:00
Plumbing Fixtures in Room C814
EHRM Miami
·
['Plumbing']
2
Betsayda Morazan
RFI
20
2025-07-22T00:00:00+00:00
Request for ASI Drawings for TRs with Revised Rack Quantities per “DATA RACKS BY TR”
EHRM Miami
·
['Cabling']
2
Betsayda Morazan
RFI
18
2025-07-22T00:00:00+00:00
Emergency Receptacle Cover Marking for Surface-Mount Installations
EHRM Miami
·
['Electrical']
1
Betsayda Morazan
RFI
17
2025-07-22T00:00:00+00:00
Space Constraints for Installation of 45kVA Transformer and 200A Panel 4th Floor Critical Power
EHRM Miami
·
['Electrical']
2
Betsayda Morazan
RFI
21
2025-07-23T00:00:00+00:00
Split Units and Condensate Pump Connection to Panel A – Redundancy Verification
EHRM Miami
·
['Electrical']
2
Betsayda Morazan
RFI
23
2025-07-25T00:00:00+00:00
Fiber Panel Density
EHRM Miami
·
['Networks']
2
Betsayda Morazan
RFI
26
2025-07-28T00:00:00+00:00
Clarification on Data Port Survey for TR C611A
EHRM Miami
·
['Networks']
2
Betsayda Morazan
RFI
25
2025-07-28T00:00:00+00:00
Request for WAP Survey to Confirm Wireless Access Point Scope
EHRM Miami
·
['Cabling', 'Networks']
5
Betsayda Morazan
RFI
19
2025-07-29T00:00:00+00:00
Cable and Data Jack Colors for WAPs, Work Area Outlets, and TR Connections
EHRM Miami
·
['Networks']
2
Betsayda Morazan
RFI
28
2025-08-04T00:00:00+00:00
Proposed Labeling Matrix – TIA-606-B Compliant
EHRM Miami
·
['Networks']
2
Betsayda Morazan
RFI
30
2025-08-07T00:00:00+00:00
Confirmation of Acceptable Selective Demolition for Existing Copper Cabling
EHRM Miami
·
['Networks']
2
Betsayda Morazan
RFI
29
2025-08-07T00:00:00+00:00
Clarification on Acceptability of Cable Length Test Failures at Closeout (Per TIA 568-B)
EHRM Miami
·
—
2
Betsayda Morazan
RFI
34
2025-08-11T00:00:00+00:00
Request for Mounting Locations for Siemens Control Panels
EHRM Miami
·
['Design Systems Integrator']
2
Betsayda Morazan
RFI
33
2025-08-11T00:00:00+00:00
Clarification on BAS Control Expectations Following System Alarm
EHRM Miami
·
['Building Management System']
2
Betsayda Morazan
RFI
32
2025-08-11T00:00:00+00:00
Clarification on System Status Points for Ductless Split VRF Units
EHRM Miami
·
['Design Systems Integrator']
2
Betsayda Morazan
RFI
31
2025-08-11T00:00:00+00:00
VRF Network Configuration – Recommendation for Additional Gateways
EHRM Miami
·
['Design Systems Integrator']
2
Betsayda Morazan
RFI
36
2025-08-26T00:00:00+00:00
Cylinder and Core Requirements
EHRM Miami
·
['Architectural']
2
Betsayda Morazan
RFI
27
2025-08-27T00:00:00+00:00
Suspected and Confirmed Asbestos – 8th and 9th Floor Rooms Not Included in Original Survey
EHRM Miami
·
['Other']
1
Betsayda Morazan
RFI
37
2025-09-01T00:00:00+00:00
Roofing Material Specification Clarification
EHRM Miami
·
—
2
Betsayda Morazan
RFI
39
2025-09-22T00:00:00+00:00
Clarification on Ductwork Routing – Room C1201B
EHRM Miami
·
['Plumbing']
1
Betsayda Morazan
RFI
41
2025-09-24T00:00:00+00:00
VRF Unit Location – Roof Plan Conflict
EHRM Miami
·
['Mechanical']
4
Betsayda Morazan
RFI
40
2025-09-24T00:00:00+00:00
Clarification on Sleeve Fill Ratios
EHRM Miami
·
['Cabling']
2
Betsayda Morazan
RFI
42
2025-10-03T00:00:00+00:00
Reverse Sequencing Proposal for Data Cabling
EHRM Miami
·
['Electrical', 'Other']
4
Betsayda Morazan
RFI
43
2025-10-14T00:00:00+00:00
Wire Size from Primary Bus Bar to Secondary Bus Bar and Bonding Clarification
EHRM Miami
·
['Electrical']
Betsayda Morazan
RFI
45
2025-10-22T00:00:00+00:00
Conductive Floor Bonding – Copper Tape Connection
EHRM Miami
·
['Electrical']
Betsayda Morazan
RFI
47
2025-10-27T00:00:00+00:00
Clarification on Work Sequencing and Schedule Revisions Description of Issue
EHRM Miami
·
['Other']
Betsayda Morazan
RFI
46
2025-10-27T00:00:00+00:00
Door Frame Finish Color Clarification
EHRM Miami
·
['Interior/Finishes']
Betsayda Morazan
RFI
50
2025-11-09T00:00:00+00:00
DDC-CAD Drawings Request
EHRM Miami
·
['Design Systems Integrator']
Eduardo Rodriguez Silveira
RFI
51
2025-11-27T00:00:00+00:00
Clarification on Existing Cabinet Relocation
EHRM Miami
·
['Other']
Betsayda Morazan
RFI
53
2025-12-03T00:00:00+00:00
Siemens IP Addressed request (65)
EHRM Miami
·
['Building Management System', 'Design Systems Integrator',
Eduardo Rodriguez Silveira
RFI
58
2026-01-20T00:00:00+00:00
Existing 120V Receptacle Availability
EHRM Miami
·
['Electrical']
Betsayda Morazan
RFI
62
2026-02-03T00:00:00+00:00
Access Control Panel Power Source Clarification
EHRM Miami
·
['Electrical']
Betsayda Morazan
RFI
61
2026-02-03T00:00:00+00:00
DDC Controller Power Source and Panel Assignment
EHRM Miami
·
—
Betsayda Morazan
RFI
60
2026-02-03T00:00:00+00:00
Confirmation of Grounding Design Intent for Telecommunications Spaces
EHRM Miami
·
—
Betsayda Morazan
RFI
65
2026-02-05T00:00:00+00:00
Additional Fire-Rated Sleeve Requirement in TR's
EHRM Miami
·
—
2
Betsayda Morazan
RFI
64
2026-02-05T00:00:00+00:00
DDC Controls Mounting Location Clarification
EHRM Miami
·
['Other']
Betsayda Morazan
RFI
38
2026-02-17T00:00:00+00:00
Fire Extinguisher Cabinets in TR-Rooms – Clarification on Mounting and Size
EHRM Miami
·
['Architectural', 'Concrete', 'Fire Protection']
Betsayda Morazan
RFI
66
2026-02-18T00:00:00+00:00
Clarification of Ductless System Design Intent in TRs
EHRM Miami
·
—
2
Betsayda Morazan
RFI
68
2026-03-04T00:00:00+00:00
Fiber Cable Sharing Fire-Rated Sleeves in TR's
EHRM Miami
·
—
Betsayda Morazan
RFI
11.1
2026-04-05T00:00:00+00:00
ISB Fiber Path
EHRM Miami
·
['Cabling']
Betsayda Morazan
RFI
69
2026-04-08T00:00:00+00:00
MCR-Rack Elevation and Utilization of Cabinets in place
EHRM Miami
·
['Other']
2
Betsayda Morazan
RFI
045
2026-05-05T17:00:00+00:00
Elevator Pit Waterproofing Spec
Gainesville Elevators
·
—
RFI
16
Clarification on VAV and Controls Removal at Room C814
EHRM Miami
·
['Mechanical']
3
Betsayda Morazan